Tan67 R2 version 25:00 on the evening of May 9th(First group, you need to confirm the receipt first)
Top a week
Expected construction period 37 days(Single shell period of 20 days)
The outer casing is used in one-piece CNC, and the upper cover cover is used, Gasket structure, Poron sandwich cotton, low cotton, gasket
Single-shell 350 yuan shell + PC positioning plate + Poron gasket + bottom cotton(Single-shell sandwich cotton needed to buy)
Case dyeing color is currently
Basic color matte translucent, pink, bright blue, black
(Will be dyed after the big goods come out to give you home)
Positioning board unified 1.5mm PC positioning board
PCB: Welding is STM32 master global RGB shaft lamp, with 16 bottom lights, matrices all open, light effect is full, and the shaft
Hot unloading is STM32 master global RGB shaft lamp, with 16 bottom lights, matrix all open, light effect is full, positive shaft
(Hot plug + 50 yuan)
Gasket structural edge use 3.5mm gasket, 3.7 sandwich cotton Poron bottom cotton(Bottice open light hole)
No satellite axis
Suite price welding 499.9 yuan hot plug 549.9
R1 users buy kit discount 30 yuan, purchase single shells do not need to be reduced by 35
(Is equal to R1 users upgrade package 285 yuan)